Quality requirements belong in the supply scope from the outset. CoreCast coordinates manufacturing checks and records with the approved project documentation, from drawing revisions through to release and handover.

Discuss your project
  • Approved documentation
  • Manufacturing checks
  • Project-specific records

Checks through the manufacturing process

Directors Tom Bache and Joshua Brennan are hands-on, bringing experience in precast operations, QA and production. Clear scope and regular progress communication keep manufacturing queries connected to your project team.

Drawing and revision coordination

Confirm the current drawing revisions, specifications, element schedule and required approvals before preparing production. Dimensions, reinforcement, openings, cast-ins, finishes and connection details need to be coordinated within the documented package.

Drawing changes and unresolved details are raised with the project team. Engineering decisions remain with the relevant engineers, with affected production coordinated around the required approvals.

Pre-pour checks

Checks before casting address mould setup, reinforcement placement, cover, openings, cast-in items and lifting inserts against the approved documentation. Finish requirements and nominated faces are included where relevant.

The required check points and records are agreed for the package. Matters needing clarification are recorded and referred to the responsible project team before the affected work proceeds.

Material and concrete-strength verification

Material testing and concrete strength verification are coordinated to the project specification and agreed manufacturing requirements. Required test information is reviewed alongside the element and pour records.

Confirm testing, reporting and release requirements when agreeing the scope. Strength requirements for handling and release follow the approved engineering and project documentation, not a standard promise about curing time.

Manufacturing records and engineering responsibilities

Manufacturing/QA records bring together the checks, pour information, test results and recorded manufacturing queries required for the agreed package. Tell us what your builder, engineer or client requires for their project file.

Lifting design is by qualified engineers. Third-party engineering certification is coordinated where required by the project and agreed scope. This does not replace the relevant engineers' design responsibilities or imply a blanket compliance certification.

Release, delivery and handover

Release review considers the recorded checks, required strength verification, finish requirements and any outstanding manufacturing matters against the agreed documentation. Delivery sequencing and the required handover information are coordinated with your team.

CoreCast manufactures, supplies and coordinates delivery. Site erection, craneage, rigging, propping, bracing, grouting, connection work and installation are by others. Manufacturing records do not certify work outside CoreCast's supply scope.

Project enquiries

Define the records your project needs

Include QA and handover requirements with your drawings so they can be reviewed as part of the supply package, rather than left until delivery.

  • Current approved drawings and specification
  • Required manufacturing checks and approval points
  • Material testing and concrete-strength requirements
  • Project-specific engineering certification requirements
  • Required handover records and delivery programme